Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 47 results ...

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method, Unpublished PhD Thesis, , University of Alberta (Canada).

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process, Unpublished PhD Thesis, , University of Alberta (Canada).

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry, Unpublished PhD Thesis, , University of Alberta.

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Chehayeb, N N (1996) Simulation-based project control, Unpublished PhD Thesis, , University of Alberta (Canada).

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance, Unpublished PhD Thesis, , University of Alberta (Canada).

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis, Unpublished PhD Thesis, , University of Alberta (Canada).

Ekyalimpa, R (2015) A distributed simulation approach for contractor company performance management in the construction industry, Unpublished PhD Thesis, , University of Alberta.

  • Type: Thesis
  • Keywords: system architecture; key performance indicators; safety; client; simulation; validation
  • ISBN/ISSN:
  • URL: https://era.library.ualberta.ca/items/614124e0-d262-4679-9f57-50167fb451f3
  • Abstract:
    Acquiring and sustaining an edge over competitors in an era that is characterized by more complex and massive projects, scarce resources, more stringent client requirements, and higher expectations from board members is quite challenging for construction companies. It is believed that implementing sound performance management systems is effective in overcoming this challenge. Traditional performance management techniques such as the Balanced Score Card (BSC), Key Performance Indicators (KPIs), Data Envelopment Analysis (DEA), etc. have been in use, but showed a number of problems. Examples include: they are self centered, data driven, tedious to use and lagging. To overcome the problems with traditional performance management systems, a number of simulation-based systems were created. These also had their shortfalls. For example they did not model the project arrival process and competitive work acquisition process explicitly. They also did not model the work execution process and performance measure generation process in detail. This thesis study set out to advance the state-of-the-art of simulation-based performance management systems. Real world constructs that relate to the business operations of a typical construction company were abstracted and represented using different simulation paradigms. For example, the competitive work acquisition process was modelled using an agent-based approach because of the interaction that exists between autonomous or semi-autonomous and concurrently self-executing constructs. On the other hand, the execution of awarded projects at the companies was emulated using a Discrete Event Simulation (DES) modeling approach. The agent-based model was developed using the AnyLogic simulation system while Simphony and Visual Studio were used for developing the DES model. Subsequently, these two components were configured into High Level Architecture (HLA) federates and integrated to form a distributed simulation system using a distributed simulation framework known as COnstruction SYnthetic Environment (COSYE). A simulation-based performance management application was developed in this study. A number of insights were gained in the course of developing the application. For example, robust design patterns and system architecture were used that could be applied in solving other similar complex problems. Also, a number of approaches were devised for effectively modeling different ill-structured phenomena (such as safety and quality) that exist within the construction domain. Verification and validation work done on the developed application proved that the application was reliable and realistic.

El Ghandour, W (2007) Integrated information-based construction simulation system, Unpublished PhD Thesis, , University of Alberta (Canada).

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities, Unpublished PhD Thesis, , University of Alberta (Canada).

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework, Unpublished PhD Thesis, , University of Alberta (Canada).

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management, Unpublished PhD Thesis, , University of Alberta (Canada).

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites, Unpublished PhD Thesis, , University of Alberta (Canada).

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks, Unpublished PhD Thesis, , University of Alberta (Canada).

Langevine, R (2006) A decision support system for the maintenance management of buildings, Unpublished PhD Thesis, , University of Alberta (Canada).

Liu, J (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction, Unpublished PhD Thesis, , University of Alberta.

Lu, M (2000) Productivity studies using advanced ANN models, Unpublished PhD Thesis, , University of Alberta (Canada).

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice, Unpublished PhD Thesis, , University of Alberta (Canada).

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information, Unpublished PhD Thesis, , University of Alberta (Canada).

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization, Unpublished PhD Thesis, , University of Alberta (Canada).

Mohamed, Y (2002) A framework for systematic improvement of construction systems, Unpublished PhD Thesis, , University of Alberta.

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures, Unpublished PhD Thesis, , University of Alberta.

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering, Unpublished PhD Thesis, , University of Alberta (Canada).

Shahin, A A (2007) A framework for cold weather construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment, Unpublished PhD Thesis, , University of Alberta (Canada).

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints, Unpublished PhD Thesis, , University of Alberta.

Soleimanifar, M (2016) Integrated project management framework for a pipe spool fabrication shop, Unpublished PhD Thesis, , University of Alberta.

Song, L (2004) Productivity modeling for steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications, Unpublished PhD Thesis, , University of Alberta (Canada).

Wang, P (2006) Production-based large scale construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2011) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2012) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta.

Xu, J (2001) CAD-based integrated simulation environment (CAD-ise), Unpublished PhD Thesis, , University of Alberta (Canada).

Younes, B (2013) A framework for invoice management in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Yu, H (2010) An integrated approach toward lean for production homebuilders, Unpublished PhD Thesis, , University of Alberta (Canada).

Zhang, X (2006) Toward innovative and efficient infrastructure delivery, Unpublished PhD Thesis, , University of Alberta (Canada).